Keep ranking first in the country! By the end of June, the installed capacity of Shandong PV power generation had reached 37.145 million kilowatts

On the morning of the 25th, the Information Office of Shandong Provincial Government held a press conference at which the leaders of the Provincial Department of Ecological Environment introduced the ecological environment quality of the province in the first half of 2022 and the development of relevant work. The reporter learned from the meeting that in the first half of this year, the installed capacity of photovoltaic power generation in the province reached 37.145 million kilowatts, with a year-on-year growth of 45.2%, ranking first in the country.
Luo Hui, the provincial ecological environment protection inspector, introduced that Shandong actively promoted the work of "four reductions and four increases". In the first half of the year, the transmission channel cities in our province transferred and withdrew 1.05 million tons of steelmaking capacity and 1.2 million tons of ironmaking capacity. The province reduced the coking capacity by 1.8 million tons and the output by 860000 tons, reduced the crude steel output by 1.913 million tons, shut down 31 inefficient coal-fired units and 867000 kilowatts, continued to clean up 192 "scattered pollution" enterprises, and the railway cargo turnover was 88.54 billion ton kilometers, a year-on-year increase of 11.1%. By the end of June, the installed capacity of photovoltaic power generation in the province had reached 37.145 million kilowatts, with a year-on-year growth of 45.2%, ranking first in the country. The task of clean heating transformation in urban (county) and rural areas has been clarified. Qingdao, Zaozhuang and Dongying have successfully won the fifth batch of central clean heating transformation funds. At present, 13 cities in our province have been included in the central funding support cities.